Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the happy-elementor-addons domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hmsftuhc/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the premium-addons-for-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hmsftuhc/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/hmsftuhc/public_html/wp-includes/functions.php on line 6114
Rapat Kerja 2015 – HMS FT-UH
BERITA

Rapat Kerja 2015

DSCN1476

Rapat kerja (Raker) BE HMS FT-UH 2015/2016 dilaksanakan di Wisma Pemprov Malino Kab. Gowa. Raker dihadiri oleh angkatan 2009-2013 dan dibuka langsung oleh Ketua Umum BE HMS FT-UH. Raker dibuka pada tanggal 5 Juni dan berlangsung selama 4 hari.

Rapat kerja bertujuan untuk membahas Daftar Usulan Rencana Program Kerja (DURPK) yang telah diusulkan oleh setiap departemen dan kelompok khusus untuk menjalankan kepengurusan pada periode 2015/2016. Program kerja yang diusulkan merupakan program kerja yang diharapkan mampu mendongkrak prestasi HMS FT-UH di bidang ilmu ketekniksipilan.

DSCN1470

DSCN1488

Dari hasil rapat, disetujui 19 usulan program kerja dan kemudian akan disidangkan oleh Dewan Musyawarah HMS FT-UH untuk disahkan menjadi sebuah program kerja.

 

Komentar Dinonaktifkan pada Rapat Kerja 2015